Brompton Stage 7 Reserve
Previous
Next
Brompton Stage 7 Reserve
Due to this job being recoat over poorly finished surfacing, our crew had to be extremely careful and precise to ensure our surfacing was completed to the highest quality/standard. Ensuring all areas were correctly primed before being re-surfaced, adjoining pathways and areas prepped appropriately and caulking joins to hardscape where required.
The surface consisted of multiple Gezolan EPDM colour blends and changes to match the red colour theme of the play equipment. Desert Sand, Wheat & Mocha were used for the ‘yellow’ colour blend. Uluru, Desert Sand & Mocha were used for the ‘orange’ blend. Rust, Uluru & Mocha were used for the ‘red’ colour blend.